Building 3
|
A detached single storey portal frame building with glazed and profiled metal clad elevations
currently arranged to provide good quality office accommodation, R & D testing facilities and a
staff canteen area. The unit was built in 1992 and has an internal eaves height of 4.75m – there
is rear loading access and car parking for 40 vehicles.
|
|
| Ground Floor Offices |
6948 sq ft |
(645 sq m) |
| Ground Floor Research/Testing |
14096 sq ft |
(1955 sq m) |
| First Floor Offices |
11850 sq ft |
(1101 sq m) |
|
| TOTAL |
21 044 sq ft |
(1955 sq m) |
|
Areas given are approximate, measured on a gross internal basis.
|
|
|
|
|
|